free tools for production people.
These tools are not actively supported, please email bugs to bugs@nickcooklighting.com
this calculator on its own page →
D = 2d·tan(θ/2) · E = cd/d² — the math every throw distance argument ends with.
this calculator on its own page →
or just type numbers below — nothing is uploaded, the file is read in your browser.
assumes all lumens inside the beam angle — real fixtures spill; treat as an estimate.
additive only where beams fully overlap.
inverse square law runs everything: E = cd/d². everything else is geometry.
how many circuits does this rig actually need?
this calculator on its own page →
amps = watts ÷ volts · circuits = ceil(total ÷ (V × A × 0.8))
planning math, not an electrician. led rigs draw less than their rated peak but inrush is real — and movers with motors don't behave like resistors. when in doubt, ask your electrician.
universes, addresses, and how many fixtures actually fit.
this calculator on its own page →
absolute = (universe − 1) × 512 + address · sACN and art-net both number this way in every console that matters.
for the gear that predates RDM — and refuses to die.
this calculator on its own page →
if the fixture manual disagrees with the light board, the manual wins. check whether your gear counts from 0 or 1.
why the far end of the run is browning out.
this calculator on its own page →
drop = 2 × length × Ω/kft × amps ÷ 1000 (round trip through both conductors)
planning math for copper at room temperature — not an electrician, and neither is this calculator.
the little conversions you do forty times a day.
this calculator on its own page →
dec = round(% × 255 ÷ 100) · 1 fc = 10.764 lx · 1 ft = 0.3048 m.
what size screen, how bright, how far — the generic version.
this calculator on its own page →
presets are typical — your screen's spec sheet wins.
throw ratio comes from your lens spec — throw ÷ image width.
bdm = H × 2 × %eh · adm = H × 3438 ÷ vertical px (1 arcminute acuity)
fL = (lumens × gain) ÷ area ft² · throw = ratio × width · max viewing ≈ 6–8 × image height
assumes a front-projection matte screen and a projector actually hitting its rated lumens (they rarely do after year one). derate older lamps 30%.
size the wall before the quote does it for you.
this calculator on its own page →
panels wide is per section
novastar gigabit ≈ 655k px
panel px = panel mm ÷ pitch · viewing ≈ pitch in mm, read as meters · ports = ceil(total px ÷ px per port)
power and weight are per the panel spec sheet — check yours. this sizes the wall; it does not rig it.
this calculator on its own page →
C=250 incident calibration — a starting point for broadcast lighting levels, not a meter.
tc ↔ frames ↔ real time, drop frame handled.
this calculator on its own page →
drop frame skips numbers, not time — frame numbers ;00 and ;01 vanish each minute except every tenth, so 29.97 stays on the clock.
these tools are free. if one helped your show, you can buy me a coffee —
donate